
Commercial Roof Repair
Open seams, lifted flashing, backed-out screws, and clogged drains get traced from the ceiling stain back to the roof detail that let water in.
Commercial roof repair
As a Hopkinsville commercial roofing contractor, we install, replace, and repair TPO, EPDM, and metal roofs on commercial buildings.
Hopkinsville commercial roofing contractor work starts with the system the building needs. Swipe or use the buttons to compare all six.

Open seams, lifted flashing, backed-out screws, and clogged drains get traced from the ceiling stain back to the roof detail that let water in.
Commercial roof repair
White TPO sheets with hot-air welded laps fit warehouses, retail centers, and offices crowded with rooftop units and pipe penetrations.
TPO roofing in Hopkinsville
Large EPDM rubber sheets cover wide, plain roofs with few seams, and the taped laps stay flexible through cold Kentucky winters.
EPDM rubber roofs
Tapered insulation, cover board, and new drains turn a ponding flat roof into one that moves water off the deck.
Flat roofing in Hopkinsville
Plant roofs carry heavy units, exhaust fans, and pipe racks, so membrane choice and walkway pads follow the equipment.
Industrial roofing for plants
Standing seam and R-panel roofs go on shops, plants, and offices, with closures, trim, and lap sealant set at every joint.
Standing seam and R-panel metal roofsMost calls start with something an owner can see. These are the conditions that decide between a repair and a new roof.
Dried silt circles and low spots between drains show where the roof surface stopped sloping toward its outlets.
Many open laps at once point to an aging membrane, while one open lap near a curb usually traces to foot traffic.
Give in the roof surface means wet insulation below, and core cuts show how far that water has spread.
Shrinking membrane drags wall flashing down from parapets and curbs, leaving an opening right where water collects.
Cracked washers and rusted screw heads on metal panels let water follow the fastener into the purlin below.
Rust showing from inside at drains or along the eave means deck panels get replaced before any new roof goes on.
A replacement fixes more than the top sheet. Here is how the same roof reads before and after the work.
Moving leaks usually mean the problem is wider than one seam. A roof walk with core cuts shows whether repair still makes sense.
Get A Free EstimateCore cuts and a moisture check decide which of these three a roof can take.
Building codes limit layering a new roof over wet or stacked roofs, and the local inspector makes the final call on each project.
Every job follows the same five decisions, made in this order, so nothing is guessed at during tear-off.
A full walk measures the roof, notes slope, drains, and scuppers, and takes core cuts to read the layers and moisture underneath.
Spot damage gets repaired. Wet insulation or failed seams spread across the field point to tear-off or a recover instead.
Slope, deck type, and rooftop equipment point to TPO, EPDM, or metal, along with the attachment method for each.
Dumpster and crane spots, rooftop unit shutdowns, and delivery times are set with the owner before the first section comes off.
Each section is closed watertight before the crew leaves, and every finished seam is probed before the job is handed back.
We take commercial roofing work in Hopkinsville and six towns nearby. Building somewhere else in western Kentucky? Call us or send us a message.
Short answers to the questions that come up on most first visits.
Every layer from the deck up. On a warehouse or retail roof that means deck repairs, flat or tapered insulation, a cover board against foot traffic and hail, a TPO or EPDM membrane, and the flashing and edge metal at curbs, parapets, and drains. Most leaks start at those edges, so they get as much care as the open field.
Tear-off fits a roof holding trapped water or one that already carries a recover. A recover fits a dry roof that is still firmly attached. Core cuts through the old layers show which case you have, and the local inspector confirms whether another layer is allowed.
Roof size, the system chosen, and what sits under the old roof matter most. Wet insulation and rusted deck add work that only shows up at core cuts. Tear-off layers, curb and pipe count, parapet height, tapered insulation, crane access, and new edge metal round out the price, and each gets measured on the roof walk.
The Hopkinsville cooperative station recorded 13.93 inches of rain from April 1 to 7, 2025, per the National Weather Service in Paducah. Rain at that rate tests every drain and scupper, so a new roof here gets drain bowls cleared and sized, overflow scuppers through parapets, and tapered boards that move water away from curbs.
Yes. Standing seam and R-panel metal roofs on shops, plants, and storage buildings get installed and repaired, along with TPO and EPDM on low-slope decks. A roof walk settles which system belongs on a given building.
Tell us about the roof, the leaks, and the building. We will set up the roof walk and core cuts.
Leave a name and number and we will call you about the roof.
Or call now: (270) 249-6124